Smectites: The key to the cost overruns in the construction of the third set of locks of the Panama Canal

  1. Suárez, M.
  2. García-Romero, E.
  3. Baz, A.
  4. Pérez, R.
Journal:
Engineering Geology

ISSN: 0013-7952

Year of publication: 2021

Volume: 284

Type: Article

DOI: 10.1016/J.ENGGEO.2021.106036 GOOGLE SCHOLAR lock_openOpen access editor

Sustainable development goals